Build a work plan with Project, Milestone, and Task nodes
Break an initiative into meaningful work without changing the Spaces structure.
Use this tutorial when a team needs to understand the parts of an initiative, such as a customer launch or an internal improvement. You will build a small work structure on an existing Design canvas.
Understand the two kinds of project
A project in Spaces is the place you navigate to for views, tasks, and access. A Project node on Canvas organizes work inside the diagram. Dropping a Project node does not create another project in the Spaces sidebar, publish work to a department, or give anyone access.
Start in the Spaces project whose team should own this work. If you actually need another Spaces project, use the project-creation guide and the applicable creation permissions.
Build the plan
- Add a Project node from the left rail or Insert → Work items → Project. Name it Northstar launch plan and add a short description of the intended outcome.
- Add a Milestone named Ready for launch. Use milestones for meaningful checkpoints rather than every small action.
- Add Task nodes for Confirm scope, Prepare launch materials, and Approve launch checklist.
- Turn on Work. Draw from each Task to the Project node to record which Canvas project it belongs to.
- Connect Approve launch checklist → Ready for launch to show its contribution, then Ready for launch → Northstar launch plan to place the milestone in the project structure.
- If a task needs a breakdown, add smaller Task nodes and connect each smaller task to its parent Task. Keep these separate from process-order arrows.
- Open All Tasks to set owners, dates, and statuses on the work. Confirm that the tasks appear in the expected project context.
Result: the canvas explains the structure, while the task records support follow-through. The arrangement becomes useful because the work has clear names, owners, and relationships.
Add an impediment with a next action
If customer approval is missing, add a Blocker describing it. Connect the affected Task to the Blocker and choose blocked by. If you create a Task to remove the impediment, connect that Task to the Blocker and choose resolves.
Record the responsible person and next step in the task details. Do not assume that adding a Blocker node or drawing a relationship automatically sets every related task's status or completes another item.
Keep the hierarchy readable
Use Project → Project only when a nested Canvas work structure is useful. It does not create a department tree or move a Spaces project. Keep visual groupings and work relationships distinct: a swimlane can explain a team's area, while a Work connector records the supported relationship.
Before a team review, inspect the task records as well as the diagram. Treat pins and positions as visual explanations, not calculated completion measures.